Preparation of the floor for laminate coating

Preparation of the floor for laminate coating
Laminate flooring is a floor covering that is very popular today. And this is not surprising, it is a very practical material that does not require careful maintenance, is insensitive to high temperatures and external influences, the cost of laminate is much lower than many floor coverings. But in order for laminate floors to last for a long time, it is necessary to adhere to simple rules: choose a high-quality material, lay it correctly and prepare the floor well for laying. Preparing the floor for laying laminate is the most important stage in the workflow.


Dismantling of the old coating is the first stage in preparing the floor for repair. It is necessary to get rid of old floors carefully so as not to damage the old screed. If the screed has not lost its properties over time, it will be enough to seal up the existing cracks and remove the irregularities.


To align wooden floors, the first thing you need to do is to audit the old floor: replace rotten boards, tighten floorboards, remove protruding nails. The floors are leveled using sheets of plywood or chipboard, which are fixed with screws. If the floors are too uneven, then the plywood sheets are laid in two rows.


The leveling of the concrete floor is carried out by pouring a self-leveling mixture. Prepare the mixture for the screed strictly according to the instructions indicated on the package, stir it thoroughly, getting rid of lumps. To simplify the pouring process, it is necessary to divide the room into several sectors, using a wooden beam for this, and pour them in stages, start pouring from the highest point of the floor, evenly distributing the mixture with a spatula. The solution dries during the day, it is very important at this stage to exclude the occurrence of drafts and temperature differences. You can start further work no earlier than 2-3 days after the screed is completely dry.


The use of a substrate is an easy way to solve the problem of sound, hydro and thermal insulation and correct any irregularities. The substrate options are diverse: cork, polystyrene foam, polyethylene foam, its choice depends on the quality of the "rough floor", humidity of the room, dynamic requirements for the floor covering, whether floor insulation will be used.


Preparation of the base for laminate coating is a rather long and troublesome process, but the service life of new floors, their strength and functionality depend on the quality of these works. https://betting24.in/